Supply chain

DESIGN BRIEF TO NEXT DROP

One continuous loop. The last step feeds the first — customer data decides what gets developed next, which is the whole argument for owning product development rather than buying finished garments.

Planning assumption — not verified data

Indicative full cycle: 110 days · target repeat cycle: 45 days

Europe design brief

UK

5 days

India product development

India

10 days

Fabric sourcing

India

12 days

Sampling

India

14 days

Fit approval

UK + India

7 days

Production

Vendor network

28 days

Quality control

India

5 days

Packing

India

3 days

Export and freight

India → UK

12 days

UK / EU fulfilment

3PL

2 days

Customer

UK / EU

2 days

Returns

3PL

7 days

Data and customer insight

India tech

3 days

Next product drop

UK + India

Loop

Data and customer insight feed straight back into the next design brief

Where time is lost

Fit approval and fabric sourcing. Both are fixable with an in-house sample room and a standing weekly review slot.

Where cost is decided

Fabric and MOQ, before a single garment is cut. Flexible MOQ costs 8–15% per unit — that is the price of not overproducing.

Where the brand is won

Returns and repeat purchase. A return is a fit-data event, not just a cost line.